Removing the old first floor from the PMR gîte (day 5 and final day)
Saturday and the last day of removing the floor, although we'll leave the small section at the top of the staircase as the last full beam is connected to it. A good cleanup of the bits of wood, sawdust (green), etc.
and finally preparation for tomorrow to put in the final 2 rows of blocks on which the new floor will sit. Those beams (100x200mm, 5.5m and 3.5m lengths) are all outside waiting to be fitted.