New first floor joists in PMR gîte (day 4 of 3 😁)
Some final jobs before we start laying the plywood sub-floor.
The old staircase had be partially removed so we could finish with the joists. The dark joist below will be where the new staircase will attach to.
We've also cut, fitted and secured (with a nail gun), the noggins. These are just short pieces of off cuts placed between the joists to maintain the spacing, keep them vertical and secure them to the top plate.
Wow, only a few then haha. God that Gîte is flying along
ReplyDelete