We have now put in 10 rows of block around all the walls including the separating wall between the bathroom and bedroom on the ground floor. Once we have removed the first floor we will add 2 additional row of block to raise the ceiling by approx. 20cm.

This is looking into the bedroom from the kitchen...


Inside the bathroom, door on the right, shower on the right... 


Inside the bathroom again, shower on the left, toilet in the middle. The old doorway has been covered up now, it was on the right...


Looking from the old bard doorway into the bedroom...