Excavations around the barn

The work around the barn eventually started today, Monsieur Lambert and his father arrived with a very large excavator and lorry and started removing the bank around the barn so we can build a terrace on three sides (forth side will be a toilet and separate (new) room for storage and preparation for events. The terrace will be 3m deep on the long sides of the barn and 5m and the gable end. 


Only day 1 so it looks a bit rough but it gives you an idea of the volume being removed and how nice it will look once done.