New sewage pipes
The Firbeix commune has built a new sewage treatment plant down towards the main road and since the chateau has been on a septic tank (fosse septique) up to now, we have to join the mains which is great for us but does mean a lot of work!
Basically we just needed to connect the entry point of the septic tank to the mains sewage point by the main road but as we want the barn and PMR gîte also connected and also the B&B rooms on the top floor, we decided to put in a new sewage line from the barn around the back of the chateau, past the 2 back gîtes and then connecting to the mains point close to the mill. We will also increase the capacity from a 100mm pipe to 125mm.
While the digging is going on, we'll also run a new water line for the PMR gîte.
This work started today and a lot of progress was made
That is just great! blown away to see the amount of work and digging around the house!
ReplyDeleteHow long until you've gone and bought yourself a small excavator
ReplyDeleteJust a small one...?😊