Pool deck framing nearly completed

Another blistering hot day in France today but we managed to complete the deck sub-structure except for the 4m end beams. Putting the last weed mesh down and covering with hardcore was a delight in 36°C temperatures! 




The deck boards are scheduled for delivery early next week but I'm going to look at installing lights around the deck so it can be used in the later evening. There is a power line at the end of the pool where we removed the block wall so it should be quite straight forward to extend the line around the edge of the pool to the deck.