Foundations for internal block wall
In the PMR gite we are putting in concrete block walls inside the stone walls as the quality of the stone is not good enough to leave exposed. The new block wall will also support the new floor joists (100mmx200mmx5m). Over the last few days we've been preparing by finishing the pipes (waste water for kitchen sink and dish washer and hot/cold water) that will be in the foundations on this wall, and constructing the shuttering (temporary wooden frame to support the concrete as it's poured).
It was a very tough days work with the trusty concrete mixer. For the floor slab we'll be getting the concrete delivered, no way we're going to this by hand!