Top bedroom plaster boarded
As the electrician finally returned and ran the CAT6 cable from the chateau to the gîtes, we could close up the gap left for the cables and then plaster board the ceiling and wall.
Today we finished the plaster boarding.
We allowed for a trap door into the loft space and also a small inspection cover for an electrical panel next to the window. The walls and ceiling were insulated for sound and warmth.
Also over the last few weeks we had also fitted wooden covers over the spaces left between the roof and the top of the walls. These spaces allowed for various critters to get in so I think we've stopped them entering (assuming there are none hibernating!)
Comments
Post a Comment