Barn extension foundations completed
At the same time as the terrace concrete was delivered, we also poured the concrete foundations for the extension to the barn, a kitchen/storage/preparation room and a toilet. We will have to create 2 new doorways in the barn wall to connect to the extension.

That rock slope looks pretty steep, will it Ned stabilization? Perhaps it's an optical illusion. Anyway, looks stunning.
ReplyDeleteIt is quite steep, we'll have to find some vegetation to provide support and stops the rain from eroding the soil.
Delete