Demolishing the concrete block wall in the PMR gîte

Part of converting the back barn/workshop/storage rooms into a gîte (Les Oiseaux), a concrete block wall had been put up to separate the staircase to the games room upstairs from the barn which needed removing. What seemed like a relatively straight forward job turned into something much harder as for some reason they'd used very heavy duty blocks despite it not being a load bearing wall. 









The rubble will come in handy as land fill for the adjoining room as the floor level is low. We will also add hardcore on top then insulation and finally concrete slab before tiling.

Comments

Popular posts from this blog

The chateau has doors and windows

Repointing stone walls in upstairs PMR gîte bedroom

Raising the barn roof beams